Contaminated Land Inspection Strategy 2020 - 6. Risk assessment

6.1 The process of risk assessment

6.1.1 The determination of land as contaminated land is based strongly on the process of risk assessment, defined as the combination of:

  • The scale or seriousness of the harm, or pollution of water; and
  • The likelihood that harm, or pollution of water, will occur.

6.1.2 The classifications used are derived from ‘contaminated land risk assessment. A guide to good practice’ (CIRIA, 2001), and developed initially by the Department of the Environment in their ‘Guide to Risk Assessment and Risk Management for Environmental Protection’ (DOE, 1995). The resulting matrix and descriptions for each level of risk are given in Tables 3 and 4, below. 

Table 3: Comparison of consequence against probability

This table compares the likelihood of harm with the scale or seriousness of harm to determine the level of risk. Risk generally increases as either the likelihood or seriousness of harm increases.

Adapted from CIRIA, 2001.

Likelihood Severe Medium Mild Minor
High likelihood Very high risk High risk Moderate risk Moderate/ low risk
Likely High risk Moderate risk Moderate/ low risk Low risk
Low likelihood Moderate risk Moderate/ low risk Low risk Very low risk
Unlikely Moderate/ low risk Low risk Very low risk Very low risk

6.1.3 While undertaking the risk assessment under Part 2a, consideration is to be given only to the 'current use' of the land. See Section 3.5 of the Statutory Guidance (2012) for a full explanation of the definition of 'current use'

6.1.4 Risk assessment should follow a staged process starting with a desk study accompanied with a site walkover to decide if testing is required. Only if there is evidence that potentially unacceptable risks may exist will be necessary to undertake testing of the soil and conduct a 'Generic Quantitative Risk Assessment' to assess whether the risk maybe unacceptable. Where more detailed information is required before any decision can be made as to the extent of contamination affecting receptors present on site, a 'Detailed Quantitative Risk Assessment' may be required, to help the council decide on whether an unacceptable risk exists. 

Table 4: Description of the classified risks and likely action required

This table describes each risk classification, from very high risk to negligible risk, and the likely level of investigation or remedial action required.

Risk Description
Very high risk There is a high probability that severe harm could arise to a designated receptor from an identified hazard, or, there is evidence that severe harm to a designated receptor is currently happening. This risk is likely to result in a substantial liability. Urgent investigation and remediation is likely to be required.
High risk Harm is likely to arise to a designated receptor from an identified hazard. Realisation of the risk is likely to present substantial liability. Urgent investigation is required and remedial works may be necessary in the short term and are likely over the longer term.
Moderate risk It is possible that without appropriate remedial action, harm could arise to a designated receptor but it is relatively unlikely that any such harm would be severe & if any harm were to occur it is more likely that such harm would be relatively mild.
Low risk It is possible that harm could arise to a designated receptor from an identified hazard but it is likely that this harm, if realised, would at worst normally be mild.
Negligible risk There is a low possibility that harm could arise to a receptor. In the event of such harm being realised it is not likely to be severe.

6.1.5 At the heart of all risk assessments is the conceptual model. This should be produced in both a matrix and diagrammatical format and show the relevant contaminants, contaminant pathways and receptors, forming individual contaminant pathways, which impact the site. The conceptual model is used for each stage of the risk assessment process, from the preliminary investigation right through to verification. This ensures that all unacceptable risks relating to the site are appropriately identified and allowing the targeted action of remediation to take place.

6.1.6 The process of risk assessment should be followed until either:

  • Insufficient evidence exists to show that land is contaminated and to justify further investigation, or,
  • The process is completed allowing decisions to be made as to whether to determine the land as contaminated land.

6.1.7 If, at any time of the risk assessment process, it is found that the assumptions which led to the prioritisation of the land are found to be incorrect, the risk assessment process should stop and any related site investigation cease immediately. All further efforts by the council should then be redirected onto other land in-line with the approach to prioritisation.

6.1.8 Investigations will be conducted as quickly as possible while ensuring at the same time that a robust risk assessment of the identified risks is undertaken. All investigations affecting members of the public will be performed in a manner so as to ensure minimal disruption.

6.1.9 In conducting the risk assessments as part of the Part 2a process the council will:

  • Base its assessment on risks reasonably likely to exist;
  • Ensure that all inspections are expedited so as to ensure minimal disruption to members of the public;
  • Ensure time and resources are made available to provide a robust basis for regulatory decisions to be made;
  • Ensure risk assessments follow best practice, as outlined in Contaminated Land Research 11 ('CLR11') model procedures for the management of land contamination (Environment Agency, 2004), and with reference to the Statutory Guidance 2012;
  • Stop the risk assessment process where risks originally identified are shown no longer to pose an unacceptable risk to receptors.

6.2 Desk Study and Site Reconnaissance

6.1.1 The regime is intended to resolve/prevent consequential exposures that are likely to be occurring rather than assess all previously used land. In many cases land may be polluted but without any exposure happening because it is covered with hardstanding. Such land can wait until it is redeveloped.

6.1.2 During the desk study actual evidence of a problem existing is sought. Pollution, even gross pollution is often imperceptible unless it is tested for. However, the level of evidence required to justify intrusion and costs to tax payers depends on the risks of missing the pollution. Generally whilst the pollution is not visible, it will be accompanied by other indications that the site may not have been remediated sufficiently at the time. Such evidence is shown in Table 5, below.

Table 5: Evidence required to trigger intrusive investigation

1) Physical remains tank plinths (depots, gasworks)

  • e.g. Infrastructure/pipework remaining
  • Interceptor vapour pipes (e.g. depot/petrol station)
  • Waste remaining (e.g. spent oxide/ blue billy at gasworks sites)

2) Pollution seen

  • leachate in water course (e.g. landfill)
  • Odour from oil or chemical residues (gasworks)
  • Staining of soil
  • Unexplained areas of dead ground (acidity/caustic)

3) Pollution proven e.g. samples tested as part of planning application

4) A plausible and likely pollutant linkage is brought to the council's attention.

6.2 Normal Presence of Contaminants

6.2.1 The Part 2a regime was designed to deal with contaminants which pose an unacceptable level of risk, rather than dealing with chemicals in soil which can be shown to be commonplace and widespread throughout the land, and for which for the most part is unlikely to pose an unacceptable risk to receptors.

6.2.2 In circumstances where contaminants in soil are at levels that are considered ‘normal’ or ‘background’, (that is to include both a natural and diffuse anthropogenic contribution), they 'should not be considered to cause land to qualify as contaminated land' (DEFRA, 2012a).

6.2.3 For the purposes of Part 2a, ‘normal’ levels of contaminants must be less than likely to cause harm, and are caused by geology or low level diffuse pollution sources (e.g. historic use of leaded petrol). The British Geological Survey has data showing typical background concentrations for topsoil contaminants (DEFRA, 2012b).

6.2.4 The British Geological Society has produced maps 2 of Arsenic (As), Benzo(a)pyrene (BaP), Cadmium (Cd), Chromium (Cr), Copper (Cu), Lead (Pb), Mercury (Hg), Nickel (Ni).

6.2.5 Should comparison between local and national levels of the prescribed contaminant show no significant difference the council will consider such levels as ‘normal’ for the locality. If concentrations, considered as ‘normal’, pose an unacceptable risk, investigations will proceed to decide whether the land is contaminated land.

6.3 Use of Generic Assessment Criteria

6.3.1 Soil Guidance Values and other Generic Assessment Criteria (GAC) are calculated to show the concentration which a single contaminant poses a negligible risk. The principal use of the GAC is to indicate when land is very unlikely to pose a significant possibility of significant harm to human health and so not require any further assessment. A more recent set of GACs are Category 4 Screening Values (C4SLs) that have been calculated using more likely exposure scenarios all based on SC050021/SR2. Portsmouth City Council and Public Health England endorse the use of Defra's Category 4 Screening Values (C4SLs) for chemicals so far assessed (arsenic, benzene, cadmium, chromium V1, lead and B(a)P.

6.3.2 These values are used as a tier one screening tool, the GAC helps the assessor in their decision to exclude a whole site, or parts of a site, from further inspection, or to inform where further investigation is required.

6.4 Risk Summaries

6.4.1 Where land has been investigated and unacceptable risks require the land be determined as contaminated land, the council is required to produce a risk summary for the site in question before proceeding to determine the site. The risk summary explains in simple terms the reasons for the decision.

6.4.2 The Statutory Guidance lists the following requirements for all risk assessments:

  • A summary of the authority's understanding of the risks, including a description of: the contaminants involved; the identified contaminant linkage(s), or a summary of such linkages; the potential impact(s); the estimated possibility that the impact(s) may occur; and the timescale over which the risk may become manifest.
  • A description of the authority's understanding of the uncertainties behind the assessment.
  • A description of the risks in context, for example by setting the risk in local or national context, or describing the risk from land contamination relative to other risks that receptors might be expected to be exposed to in any case. This need not involve a detailed comparison of relative risks, but the authority should aim to explain the risks in a way which is understandable and relevant to the layperson.
  • A description of the authority's initial views on possible remediation. This need not be a detailed appraisal, but it should include a description of broadly what remediation might entail; how long it might take; likely effects of remediation works on local people and businesses; how much difference it might be expected to make to risks posed by the land; and the authority's initial assessment of whether remediation would be likely to produce a net benefit, having regard to broad objectives of the regime set out in Section 2.1 of this document. In the case of land which (if it were determined as contaminated land) would be likely to be a Special Site, the authority should seek the views of the Environment Agency and take any views into account in producing the description.

6.4.3 Local authorities are not required to produce a risk summary for any land which is not to be determined as contaminated land.

6.5 Uncertainty

6.5.1 All risk assessments of potentially contaminated land involve uncertainty, including the scientific uncertainty over the impacts of contaminants.

6.5.2 The council will:

  • Minimise uncertainty as far as it considers relevant, reasonable and practical;
  • Recognise remaining uncertainty, which is likely to exist in most cases;
  • Be aware of the many assumptions and estimates that underlie the risk assessment; and
  • Be aware of the effects that assumptions and estimates will have on the conclusions.