Contaminated Land Inspection Strategy 2020 - 13. Enquiries Procedure and Arrangements for Review

13.1 Enquiries Procedure

13.1.1 Procedures are in place to:

  • Record that information or that an enquiry has been received;
  • Demonstrate an appropriate officer has been designated to deal with the request;
  • Record the request and response; and
  • Ensure appropriate records are maintained. 

13.1.2 The Environment Agency may also issue guidance to the council at any time regarding the council’s performance relating to matters concerning contaminated land, as per Section 78v of the Environment Act 1995. 

13.2 Enquiries from the Public

13.2.1 Information about potentially contaminated land may be received from the public, and these reports will be used to inform our investigative work. Whilst anonymous information is not often accepted by Council services, in the case of land contamination, anonymous reports will be accepted although the reliance placed on the information is much reduced.

13.3 Review

13.3.1 Whilst the council has a duty to inspect its area, ‘from time to time’, to identify contaminated land, the frequency of inspection is not prescribed.

13.3.2 The council has a duty to review its inspection strategy on a regular basis and to meet its statutory responsibilities. Two main aspects of review need to be built into this strategy:

  • Review of the inspection strategy; and
  • Triggers for reviewing inspection decisions.

13.3.3 In addition to the routine review of the inspection strategy, there will be situations which will trigger re-assessment including:

  • Change of use of surrounding land (introduction of new receptors);
  • The potential for contaminant linkages to become significant or urgent as a result of unplanned events (e.g. flooding, spillages etc.), or a change in circumstances;
  • Identification of a localised effect which could be associated with the land;
  • Responding to new information.

13.3.4 The strategy as a whole will be reviewed by the Contaminated Land Team annually and any proposed changes will be reported and incorporated as necessary. Particular matters that will be kept under review include:

  • The content of the strategy generally;
  • Priorities for further investigation of potentially contaminated land;
  • The potential for the introduction of new receptors;
  • The potential for new contamination;
  • Progress on voluntary remediation;
  • The enforcement process generally and the identification of appropriate persons particularly;
  • Identification of Special Sites;
  • Progress with the implementation.