Corporate Contaminated Land Strategy - 7. Building Control

7.1 The Building Regulations 1991 give the Building Control Officers authority to address contamination and landfill gas issues within the building footprint. Where a site is known to be on or adjacent to a gassing landfill Building Control Approval will only be granted subject to the design of the building(s) incorporating adequate gas control measures. 

7.2 Where historical maps or existing site investigation data indicate that the proposed development is/or may be located on greater than one metre of madeground, Building Control approval will only be granted subject to the developer either: 

  1. incorporating basic passive gas protection measures into the building design/construction, or 
  2. undertaking an appropriate level of site investigation. 

7.3 Where the ground investigation reveals any methane or significant organic material within the ground the developer must provide a report by a competent person experienced in the development of buildings on gassing sites. The investigation report must include gas monitoring on at least 6 separate occasions at appropriate locations over a minimum period of 3 months, over a variety of weather conditions and atmospheric pressures and 8 include at least two periods of low and falling barometric pressure (falling below 1005mB). The competent person should provide written confirmation that the building design provides adequate protection for the gas regime recorded at the site. 

7.4 Although the Building Control process is fundamental to the safe redevelopment of brownfield sites, it is not sufficient to have a strategy which relies on remediation controlled by building control alone because: 

  1. Building Control Officers have no control over the safe remediation of landscaped areas and car parks outside the building footprint, and 
  2. an increasing number of developers are making use of new provisions which enable them to utilise the services of private building control officers rather than LA officers. Obviously the private sector practitioners will not have the same local knowledge about historic land uses. 

Consequently, a multi-disciplinary approach to approval of remediation schemes is required involving Building Control, Planning and Environmental Health.