Dated: 23rd May 2022

Portsmouth City Council (Castle Road) (Temporary Prohibition of Driving, Loading and Waiting) (No.103) Order 2022

Notice is hereby given that Portsmouth City Council intends to make the above Order under Section 14(1)(a) of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991.

The Order comes into operation from 6th June 2022 and the effect will be as follows:-

A) TEMPORARY PROHIBITION OF DRIVING, LOADING AND WAITING

CASTLE ROAD
From the junction of Kent Road to Regent Place.

CASTLE ROAD
From its junction with Regent Place to Hambrook Street. (Access only for residents of Castle Road and Regent Place from Castle Road (southbound)).

KENT ROAD
At its junction with Castle Road (on the north side).

B) TEMPORARY PROHIBITION OF DRIVING

HAMBROOK STREET (WESTBOUND)
From its junction with Jubilee Terrace (A288) to its junction with Cecil Place.

C) TEMPORARY PROHIBITION OF RIGHT TURN

CECIL PLACE
Into Hambrook Street.

DARTMOUTH MEWS
Into Hambrook Street.

D) TEMPORARY PROHIBITION OF LEFT TURN

LITTLE HAMBROOK STREET
Into Hambrook Street.

NICKEL STREET
Into Hambrook Street.

E) TEMPORARY PROHIBITION OF WAITING (LOADING ONLY)

SOUTHSEA TERRACE
From 28 metres west of the junction of Castle Road on the north side for 26 metres west.

F) TEMPORARY SUSPENSION OF RESIDENTS PARKING PLACE (LOADING ONLY PERMITTED)

HAMBROOK STREET
Outside No.s 1 – 7 on the south side.

G) TEMPORARY SUSPENSION OF RESIDENTS PARKING PLACE

KENT ROAD
Opposite No.s 3 – 17 on the south side for 24 metres.

H) REASON FOR THE ORDER
To facilitate junction works.

I) DURATION OF THE ORDER
From 6th June 2022 for 18 months or completion of the works, whichever is sooner. Notwithstanding the above, it is anticipated that works will take no longer than 3 weeks.
TTRO 45 2021 Castle Road will be suspended for the duration of the works.

J) DIVERSION
Non-HGV diverted from Southsea Terrace – Bellevue Terrace – Jubilee Terrace – King’s Terrace – King’s Road – Castle Road.
Vehicles diverted from Hambrook Street – Bellevue Terrace – Pier Road – Duisburg Way Roundabout – Pier Road and Bellevue Terrace – Jubilee Terrace – King’s Terrace – King’s Road – Castle Road.
Pedestrian access will be maintained around the works.

Assistant Director of Regeneration (Transport), Portsmouth City Council, Civic Offices, Portsmouth PO1 2NE

A copy of the Order may be requested from networkmanagement@portsmouthcc.gov.uk or at the reception desk in the Civic Offices.