Could not get XML data.
Portsmouth City Council

B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z
-->


Living section navigation

Home > Living > Getting around > Roadworks and closures for roads A-M

Roadworks and closures for roads A-M

Follow us on Twitter - link will open in a new window

Here you'll find details of both current and planned road works and closures in Portsmouth. The information is in alphabetical order of the main road affected and gives details of the date and length of the work, the type of work and diversion routes. See the list of roadworks and closures for roads N-Z.

If you require any further information, or experience problems, please contact the contractor listed. TM means traffic management.

Alverstone Road (near junction with Rodney Road)
Nature of works:  remove yellow hatch boxes and replace with keep clear markings
Traffic control:  temporary lane closure under stop and go boards
Date:  24 March 2010 (one night)
Time:  2000 to 2200
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

Anglesea Road (from Park Road to speed camera)
Nature of works:  new speed camera loops
Traffic control:  temporary lane closures (one lane at a time) – northbound
Date:  25 March 2010 (one day)
Time:  2000 to 2400
Client/contractor:  Truvelo UK Ltd
Contact name/no:  Paul Barnett  07813 709589

Clarence Parade (just west of junction with Lennox Road South)
Nature of works:  installation of new traffic island
Traffic control:  partial lane closure (both directions) – two-way traffic will be maintained at all times
Date:  8 March to 19 April 2010 (six weeks)
Time:  0730 to 1700 (TM will stay in place overnight)
Client/contractor:  Graham Moyse Contractors Ltd
Contact name/no:  M Stride  07885 249441

Cornmill roundabout and Commercial Road
Nature of works:  street lighting scheme
Traffic control:  temporary outer lane closure on Cornmill roundabout and lane 1 closure on Commercial Road – southbound from Church Street roundabout to Market Way
Date:  22-26 March 2010 (five days)
Time:  0930 to 1530 (TM will be taken off road everyday at 1530)
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

Eastern Road (outside former East Shore School)
Nature of works:  replacement of old school crossing
Traffic control:  footway and lane 1 closure – southbound
Date:  30 March to 2 April 2010 (four days)
Time:  0930 to 1530 (footway will remain closed overnight but lane will reopen for traffic everyday at 1530)
Pedestrian diversion route:  around location of works using footway on the other side of the road
Client/contractor:  Aeropack Developments Ltd
Contact name/no:  Simon Hillier  07790 903516

Eastney Esplanade and Southsea Esplanade (from Henderson Road to South Parade Pier)
Nature of works:  to install new segregated cycle lane
Traffic control:  partial lane closure, two-way traffic will be maintained at all times
Date:  1 February to 26 March 2010 (eight weeks, no weekend working)
Time:  0800 to 1600 (TM will stay in place overnight)
Client/contractor:  Colas Ltd
Contact name/no:  Steve White  023 9231 0900

Goldsmith Avenue (junctions with Frogmore Road, Ruskin Road and Apsley Road)
Nature of works:  remove yellow hatch boxes and replace with keep clear markings
Traffic control:  temporary lane closure under stop and go boards
Date:  22 March 2010 (one day)
Time:  0930 to 1500
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

Gunwharf Road (outside exit and entrance to IOW ferry terminals)
Nature of works:  remove small yellow hatch markings and replace with keep clear, refresh large yellow markings
Traffic control:  temporary lane closure under stop and go boards
Date:  24-25 March 2010 (one night)
Time:  2300 to 0400
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

High Street, Cosham (at level crossing)
Nature of works:  barrier maintenance
Traffic control:  full road closure
Date:  17-18 April 2010 (one night)
Time:  2300 to 0700
Diversion route:  Portsmouth Road/Portsbridge roundabout/Northern Road/Wayte Street/High Street and vice versa
Other details:  (1)  One week prior to the closure, a letter drop will be delivered to all businesses from McDonalds in Portsmouth Road to the top of High Street.  (2)  Also advanced warning signs will be put up one week prior to this closure.
Client/contractor:  Network Rail/TMS Ltd
Contact name/no:  C Green (Network Rail)  01483 804013

Highland Road (outside police station)
Nature of works:  emergency carriageway repairs
Traffic control:  emergency lane closure under stop and go boards
Date:  17 March 2010 (one day)
Time:  0930 to 1530
Client/contractor:  Colas Ltd
Contact name/no:  D Broadway  07500 884722

London Road (junction with Kipling Road)
Nature of works:  installation of new traffic island
Traffic control:  lane closure – temporary two-way traffic lights
Date:  8 March to 19 April 2010 (six weeks)
Time:  0730 to 1700 (TM will stay in place overnight)
Client/contractor:  Graham Moyse Contractors Ltd
Contact name/no:  M Stride  07885 249441

London Road A3 (just south of Portsbridge roundabout)
Nature of works:  remove yellow hatch boxes and replace with keep clear markings
Traffic control:  temporary lane closures northbound – one lane at a time
Date:  22-23 March 2010 (one night)
Time:  2330 to 0400
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

M275
Nature of works:  routine motorway maintenance
Traffic control:  lane closures
Date:  12-16 April 2010 (five nights)
Time:  2000 to 0400
Client/contractor:  Colas Ltd
Contact name/no:  S Hole  07917 350920

Milton Road (between main entrance to St Marys Hospital and Priorsdean Avenue)
Nature of works:  footway cabling works
Traffic control:  temporary footway and lane closure – two-way traffic will be maintained at all times
Date:  13-20 March 2010 (seven days)
Time:  0800 to 1700 (TM will be set up after 0930 on first day and stay in place for duration of works)
Pedestrian diversion route:  around location of works using footway on the other side of the road
Client/contractor:  Cobra Construction & Networks Ltd
Contact name/no:  Larry Sinnott  07816 452724

Milton Road (outside entrance to cemetery)
Nature of works:  remove yellow hatch boxes and replace with keep clear markings
Traffic control:  temporary lane closure (at this point carriageway is three lanes wide and two-way traffic will be maintained)
Date:  22 March 2010 (one night)
Time:  2000 to 2400
Client/contractor:  Colas Ltd
Contact name/no:  Des Stone  023 9231 0900

 

 


Portsmouth City Council
Guildhall Square
Portsmouth
Hampshire, PO1 2BG
023 9283 4092
general@portsmouthcc.gov.uk