Roadworks and closures for roads A-M
Last updated: 23 May 2013 16:01 UKHere you'll find details of both current and planned roadworks and closures in Portsmouth. The information is in alphabetical order of the main road affected and gives details of the date and length of the work, the type of work and diversion routes. See the list of roadworks and closures for roads N-Z.
A27/A2030 - Eastern Road, Farlington Roundabout
Nature of works: street lighting
Traffic control: temporary inner lane closure on roundabout
Date: 23 May 2013
Time: 0930 to 1530
Client/contractor: Colas Ltd
Contact name/no: Paul Taylor 023 9231 0925
Albert Road (between Chelsea Road and Napier Road - two locations)
Nature of works: water mains repair
Traffic control: lane closure under temporary two-way traffic lights
Date: 28 May to 3 June 2013
Time: 0800 to 1700
Client/contractor: Portsmouth Water
Contact name/no: Jason Bowles 023 9249 9888
Anchorage Road (just west of junction with Eastern Road)
Nature of works: working on telecommunication mast
Traffic control: partial 'turn left' filter lane closure
Date: 28 May 2013
Time: 0930 to 1530
Pedestrian diversion: pedestrians to be marshalled around working area
Client/contractor: Road Traffic Solutions
Contact name/no: Duty Manager 01724 848246
Anglesea Road
Nature of works: ducting box cover and frame renewal
Traffic control: St Michael's Road/Anglesea Road - temporary lane 1 closure - northbound; Park Road - temporary 'turn left' filter lane closure
Date: 3 to 4 June 2013
Time: 0930 to 15 30
Client/contractor: Colas Ltd
Contact name/no: Steve White 023 9231 0900
Burrfields Road - adjacent to The Farmhouse PH
Nature of works: new sewer culvert construction
Traffic control: lane closure under temporary two-way traffic lights
Date: 21 May to 5 June 2013
Time: 0730 to 1700
Pedestrian diversion: pedestrians will be diverted within the site
Client/contractor: 4D Ltd/Colas Ltd
Contact name/no: Mike Yung-Hok 01293 564800/07899 877281
Commercial Road (outside Portsmouth & Southsea Station)
Nature of works: railway bridge maintenance
Traffic control: temporary lane closure under two-way traffic lights
Date: 29 May 2013
Time: 0001 to 0500
Client/contractor: Centurion Site Services
Contact name/no: Emma Osborne 07791 179882
Commercial Road (outside Portsmouth & Southsea Station)
Nature of works: railway bridge maintenance
Traffic control: temporary lane closure under two-way traffic lights
Date: 4 June 2013
Time: 0001 to 0500
Client/contractor: Centurion Site Services
Contact name/no: Emma Osborne 07791 179882
Commercial Road (outside Portsmouth & Southsea Station)
Nature of works: railway bridge maintenance
Traffic control: temporary lane closure under two-way traffic lights
Date: 11 June 2013
Time: 0001 to 0500
Client/contractor: Centurion Site Services
Contact name/no: Emma Osborne 07791 179882
Commercial Road (outside Portsmouth & Southsea Station)
Nature of works: railway bridge maintenance
Traffic control: temporary lane closure under two-way traffic lights
Date: 18 June 2013
Time: 0001 to 0500
Client/contractor: Centurion Site Services
Contact name/no: Emma Osborne 07791 179882
Commercial Road (outside Portsmouth & Southsea Station)
Nature of works: railway bridge maintenance
Traffic control: temporary lane closure under two-way traffic lights
Date: 25 June 2013
Time: 0001 to 0500
Client/contractor: Centurion Site Services
Contact name/no: Emma Osborne 07791 179882
Commercial Road (outside BP Service Station)
Nature of works: renew damaged barrier
Traffic control: emergency lane 3 closure (southbound) between Mile End Road roundabout and All Saints Street
Date: 23 to 24 May 2013
Time: 2200 to 0500
Client/contractor: Colas Ltd
Contact name/no: Tony Davis 023 9231 0900
Copnor Road (junction Locarno Road and Domum Road)
Nature of works: replace manhole cover
Traffic control: lane closure under temporary two-way traffic lights
Date: 28 May 2013
Time: 2000 to 2300
Client/contractor: Clancy Docwra
Contact name/no: David Switzer 07807 830068
Copnor Road (junction Winton Road)
Nature of works: replace manhole cover
Traffic control: lane closure under temporary two-way traffic lights
Date: 28 May 2013
Time: 2000 to 2300
Client/contractor: Clancy Docwra
Contact name/no: David Switzer 07807 830068
Fratton Road (outside St Mary's Church, opposite Church Road)
Nature of works: carriageway resurfacing
Traffic control: lane closure under illuminated stop and go boards
Date: 5 to 7 June 2013
Time: 2000 to 0530
Client/contractor: Colas Ltd
Contact name/no: Steve White 023 9231 0900
Havant Road (outside No 195)
Nature of works: replace telegraph pole
Traffic control: lane closure under temporary two-way traffic lights
Date: 9 June 2013
Time: 0930 to 1530
Other details: parking opposite No 195 and outside the health centre will be suspended
Client/contractor: A Plant Lux Traffic
Contact name/no: A Plant Lux Traffic 03700 500792
Kingston Road (between Basin Street and Fratton Road)
Nature of works: carriageway overbanding (mobile works)
Traffic control: temporary lane closure under stop and go boards
Date: 20 to 31 May 2013 (no weekend working or Bank Holiday 27 May 2013)
Time: 0930 to 1530
Client/contractor: Colas Ltd
Contact name/no: Steve White 023 9231 0973
Kingston Road (from junction of Powerscourt Road to Washington Road)
Nature of works: carriageway resurfacing
Traffic control: lane closures (north and southbound - one side at a time) under stop and go boards
Date: 3 to 5 June 2013
Time: 0930 to 1530
Client/contractor: Colas Ltd
Contact name/no: Steve White 023 9231 0900
Lennox Road South – Experimental Road Closure
An experimental closure is in place to address traffic and safety concerns. It prevents vehicles from reaching or leaving the seafront via Lennox Road South, which is a declassified/residential road and unsuitable for large volumes of two-way traffic. The closure was the most popular of four traffic-calming options discussed with residents. An additional closure point has been added within Villiers Road to support this measure. After October 2013 a decision will be made as to whether to make the road closure permanent.
Milton Road (outside St Mary's Hospital)
Nature of works: installation of a new electrical service
Traffic control: temporary lane closure under four-way traffic lights
Date: 28 to 31 May 2013
Time: 0800 to 1700
Pedestrian diversion: a walkway will be provided in the carriageway during works
Client/contractor: SSE Portsmouth Depot
Contact name/no: Ade Oakley 07767 851609